Search:
Filter results by:
Topic
Recommendations
Key Findings
Tasks
Questions we Asked
Issues
Stakeholders
Geographic Area

Search for the following document types:

All Projects


The science and research conducted as part of the International Upper Great Lakes Study was essential to support the Study Board's key findings and recommendations.  A list of projects is provided below.  Use the filters provided to help find what you're looking for, and select "View Details" to find more information about projects you are interested in.

Filter results by:
or
St. Clair HydroSed2D Modelling

Xiaofeng Liu; Gary Parker

Hydrodynamic & sediment modelling of the effects of physical changes and sediment transport on St. Clair River's conveyance
View details
GIA Workshop

Frank H. Quinn; Chuck Southam

Workshop to assess impact of glacial isostatic adjustment on apparent reduction in Michigan-Huron to Erie head difference
View details
Review of Apparent Vertical Movement Rates

Jacob Bruxer; Chuck Southam

Analysis of apparent vertical movements caused by glacial isostatic adjustment based on water level differences
View details
Great Lakes Volume Changes from GIA

Jacob Bruxer; Chuck Southam

Changes in water volume of the Great Lakes due to glacial isostatic adjustment
View details
Pre-1960 Parry Sound Water Levels

Frank H. Quinn; Chuck Southam

Estimates of pre-1960 water levels at Parry Sound illustrate the impact of glacial isostatic adjustment on Georgian Bay
View details
Huron and Erie Water Level Gauge Analysis

Frank H. Quinn; Chuck Southam

Review gauge stability/suitability, data analysis to assess movements between sites and movements relative to outlet.
View details
GIA Impacts on Huron - Erie Head Difference

Chuck Southam; Frank H. Quinn

Impacts of glacial isostatic adjustment on the reduction in Lake Michigan-Huron to Erie head difference was assessed
View details
Review of St. Clair Compensation Options

W. F. Baird & Associates;

Review of potential St. Clair River structures to compensate effects of past dredging and for flow regulation purposes
View details
Institutional Feasibility of St. Clair Compensating Works

Ralph Pentland;

Institutional feasibility of structures in St. Clair River to restore Lake Michigan-Huron to pre-dredging levels is reviewed
View details
Residual NBS

Nannette Noorbakhsh; David Fay

Updating of the historical coordinated monthly net basin supply estimates as developed using the residual method.
View details